| Date: |
5-2-2008 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Elevator metal rib |
|
|
Managed to cut all six ribs for the elevator with aviation snip. The edges were filed and deburred. Bending of the metal strips is not yet done. |
||