Date:    3-2-2008
Number of Hours:    2.00
Brief Description:    Horizontal Stab Prep
Trimming the steel ribs for the rudder & intend to send it to the shop for bending. Take sometime to cut a plywood for the horizontal stab & a line was then drawn as per plan.