| Date: |
12-28-2008 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Tail area |
|
|
Managed to weld the side diagonal at the tail end as well as the lower vertical tube bracing. Welding to the horizontal stab tubing take a while due to the double layer of the tubing. Had to heated up the area really well and use hotter flame. |
||