| Date: |
9-14-2009 |
|
| Number of Hours: |
1.30 |
|
| Brief Description: |
Drilling (Cont.) |
|
|
Making a slot to the metal sheet that will support the movement of the horizontal stabilisor leading edge. The slot was firstly drilled and filed into shape. |
||