Date:    7-9-2009
Number of Hours:    4.50
Brief Description:    Misc Item -shaping (cont)
1. Cuttting 3 new pieces of the aileron arm and 2 pieces fuel valve holder (1.25 hrs)
2. Conditioning the metal tabs to its proper shaped - 35 pieces ( 1.75 hrs)
3. Smooth filing the edges 5 pieces of 0.125" misc items - rudder and elevator horn, torque tube horn and aileron actuator (1.5 hrs)