| Date: |
7-9-2009 |
|
| Number of Hours: |
4.50 |
|
| Brief Description: |
Misc Item -shaping (cont) |
|
|
1. Cuttting 3 new pieces of the aileron arm and 2 pieces fuel valve holder (1.25 hrs) 2. Conditioning the metal tabs to its proper shaped - 35 pieces ( 1.75 hrs) 3. Smooth filing the edges 5 pieces of 0.125" misc items - rudder and elevator horn, torque tube horn and aileron actuator (1.5 hrs) |
||