Date:    7-13-2003
Number of Hours:    2.00
Brief Description:    Fuselage Jig Preparation
Jig prepartion for the fuselage. A line depicting the tubing size was drawn parallel to the fuselage line drawn earlier. A wooden block was placed at the table side around the cockpit area to hold the fuselage..