| Date: |
7-13-2003 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Fuselage Jig Preparation |
|
|
Jig prepartion for the fuselage. A line depicting the tubing size was drawn parallel to the fuselage line drawn earlier. A wooden block was placed at the table side around the cockpit area to hold the fuselage.. |
||