| Date: |
12-29-2007 |
|
| Number of Hours: |
1.80 |
|
| Brief Description: |
Vertical & Horizontal Stab Prep |
|
|
Further aligment of the vertical stab in preparation for a tack weld. Refinement of the cut was again done to ensure a proper fitting. Once the vertical tube is in place, the jig was then prepared for holding the horizontal stab. U link was fitted and adjusted. |
||