Date:    12-29-2007
Number of Hours:    1.80
Brief Description:    Vertical & Horizontal Stab Prep
Further aligment of the vertical stab in preparation for a tack weld. Refinement of the cut was again done to ensure a proper fitting. Once the vertical tube is in place, the jig was then prepared for holding the horizontal stab. U link was fitted and adjusted.