| Date: |
11-28-2007 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Fuel Tank Support |
|
|
The centre tube was cut to hold the centre joint and it took a while to fit the other end with the firewall tubing. After final adjustment, all the joint was than tack welded. |
||