| Date: |
9-17-2007 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Fuselage Prep & blowhole |
|
|
In preparation of welding the fuselage. All tube joints are clean by amery cloth and rust cleaner. A small hole of 1/16 " was drilled about an inch from the base of the tubing. The small hole will ensure the presurise air inside the tube is release during welding and does not create a blow hole. At a later stage oil will be injected inside the hole to prevent rust and welded close. |
||