| Date: |
6-28-2004 |
|
| Number of Hours: |
0.30 |
|
| Brief Description: |
Tail Area checking |
|
|
The upper fuselage frame diagonal between sta 73 3/8 and 115 3/8 and the horizontal tube (floor) at sta 154 3/8 need to re tack. Both tubing are than firmly held to get ready for the next re tacking. |
||