| Date: |
5-18-2003 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Checking welding & fitting |
|
|
Repaired the front vertical longeron and diagonal longeron attached to the square tube. Re filed and than tack weld again. Looks fine. |
||