| Date: |
10-3-2011 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Cowling oil door, air box inlet |
|
|
Cut the oil door opening in the upper cowling. I had already laid up the door before the cut, so I put my last coat of filler on the top before I fit it to the opening. Also attached the custom airbox transition to the airbox. It still needs a bit of fairing on the inside to smooth out the surface. |
||