| Date: |
7-8-2010 |
|
| Number of Hours: |
4.50 |
|
| Brief Description: |
Conduit, wiring |
|
|
Installed 1 conduit in each wing and secured withe RTV, and ran 1 16 guage wire in each. Today, I will wire tie the second conduit and install the final wires and AOA tubing. Also started on the aileron gap fairings. |
||