Date:    7-8-2010
Number of Hours:    4.50
Brief Description:    Conduit, wiring
Installed 1 conduit in each wing and secured withe RTV, and ran 1 16 guage wire in each. Today, I will wire tie the second conduit and install the final wires and AOA tubing. Also started on the aileron gap fairings.