| Date: |
2-22-2011 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Side steps |
|
|
Cleaned and etched the side steps. Primed both the steps and the fusalage before installation. Attatched the mounting blocks on the inside and prepared the steps for riveting. |
||