Date:    11-25-2010
Number of Hours:    2.50
Brief Description:    Installed control column pushrod, brakes.
Installed the control column pushrod from the control column to the bellcrank. Started working on the brake installation. Practicing bending and flaring the 1/4" aluminum tubing that is used for the brake and fuel vent lines.