| Date: |
9-6-2010 |
|
| Number of Hours: |
6.50 |
|
| Brief Description: |
F635 Bellcrank, 712 bulkhead |
|
|
Finished building, priming and installing the bellcrank assembly. built the rear tiedown and installed it in the rear 712 bulkhead. |
||