Date:    3-11-2014
Number of Hours:    0.75
Brief Description:    Step 5-6 and Priming
Removed hatched area from VS-1401. Dimpled pieces as per drawing. (aft side of the part). Cleaned with KTM, and lightly primed with Zinc Phosphate.