| Date: |
11-19-2014 |
|
| Number of Hours: |
0.75 |
|
| Brief Description: |
Step #2 and #3 Modifying Ribs |
|
|
Opened aft flange on the 2 - HS-905 Nose ribs by 10 deg using hand seamer. Also, opened aft flange on the 2 - HS - 1004 Inspar ribs by 10 deg. On the same inspar ribs bent forward flange by 12.5 deg, and made 2.5 deg bend between forward notches. |
||