| Date: |
10-18-2014 |
|
| Number of Hours: |
1.15 |
|
| Brief Description: |
Step #2 Riveting inboard hinge brackets |
|
|
Clecoed every other hole in the bracket and clamped assembly to the worktable. Squeezed open holes with AN470AD4-6 rivets. Then moved clecoes to the other side and sqeezed other 3 holes. All rivets are up to spec. |
||