| Date: |
10-15-2014 |
|
| Number of Hours: |
0.70 |
|
| Brief Description: |
Step #7 Drilling and scuffing hinge brackets |
|
|
Marked all hinge brackets with A,B,C,and D, and 1 for left side and 2 for right side. Marked Top on doubler and left side with green and right side with blue. Removed all parts. Final drilled one hole on all hinges with #12 drill. Started scuffing glossy finish on all hinge brackets. Did 4 brackets and left other 4 for next time |
||