| Date: |
10-15-2014 |
|
| Number of Hours: |
0.75 |
|
| Brief Description: |
Step #5-6 Csk and drilling holes |
|
|
Csk 2 holes on the Spar as per drawing. Before Csk backed out cage 10 clicks to make sure, and it hapened to be exact setting (very lucky that I made that descision). Backed out 1 click for the second hole, and the rivet was sitting too high. Backed in 1 click and finished csk. Final drilled 4 holes around csk holes with #12 reamer |
||