| Date: |
3-27-2010 |
|
| Number of Hours: |
8.50 |
|
| Brief Description: |
Laid out left and right main spars. |
|
|
Laid out left and right main spars. Trimmed main spars to size. Center drilled main spars attachment points. Center drilled and filed to size 2 of the 4 inside main spar attach plates. Center drilled and filed to size 1 of the 4 main spar splice plates. Routed out right main spar lightening holes. |
||