Date:    8-1-2016
Number of Hours:    2.00
Brief Description:    Jig station 1
Forward cabanes were carefully ground to meet with the angled cuts on top of station 2 before tack welded.

Timber arms sit 24-1/4" forward of the bottom of station 2 and 4-1/2" higher. Everything is perfectly level.