| Date: |
2-1-2017 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Setting up to run |
|
|
The prop is bolted on (yet to be torqued) and essential engine monitors are being connected prior to first run. Tiny Tach tachometer EGT & CHT probes and gauge Oil pressure and temp gauge as well as the P-Lead. Waiting on the Valvoline VR1 Racing Engine Oil 10W-40 which has a high zinc content, essential in looking after the old technology internals. The test panel is mounted on the side of the fuselage so I can read it easily when standing beside and operating the throttle just below. |
||