| Date: |
5-12-2016 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Rib jg |
|
|
Pre drilled each nose rib with 2 pilot holes. 3/16" dia. Screwed up from under the bench through the first 2 which are already shaped and into the 3 above. The router bearing sits on the bottom 2 and routes the top 3 to shape. |
||