| Date: |
8-4-2011 |
|
| Number of Hours: |
1.10 |
|
| Brief Description: |
Began initial assembly of left flap |
|
|
Tonight I had to finish a lot of work type stuff, so had limited time to work on the RV. I did finish smoothing the edges of the ribs, so was able to begin the initial assembly. Started by clecoing and drilling the ribs to the spar, then the spar/rib assembly was clecoed to the skin. It was really late by then, so gave it up for the night. |
||