| Date: |
5-21-2017 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Preparation for battens |
|
|
I preparedthe fuselage for the side and bottom battens. Bottom will have two battens to allow for a hatch below the elevator bellcrank. |
||