| Date: |
7-2-2015 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Elevator T-nuts |
|
|
I epoxied the 12 elevator T-nuts today. This finishes the T-nuts job for the empennage. I liked the idea so, I will use the same T-nuts for fixing the bearing blocks of the rudder pedals and joystick torque tube bearings to the 6mm (1/4") ply floor. |
||