Date:    3-28-2020
Number of Hours:    0.50
Brief Description:    Rear Spar drilling
Continued drilling the rear spar and doublers. Piloted everything, then drilled full size

6W11-20 needs to be trimmed, even after the overlap area.

Areas that need joggles (IMHO)