| Date: |
3-28-2020 |
|
| Number of Hours: |
0.50 |
|
| Brief Description: |
Rear Spar drilling |
|
|
Continued drilling the rear spar and doublers. Piloted everything, then drilled full size 6W11-20 needs to be trimmed, even after the overlap area. Areas that need joggles (IMHO) |
||