Date:    12-22-2007
Number of Hours:    2.00
Brief Description:    Elevator Drilling
Finished match drilling the elevator skins to the skeleton. Drilled the holes for the trim cable anchor brackets in the cover plates. Dimpled the holes in the cover plate. Disassembled everything for deburring, surface prep and dimpling.