Date:    12-21-2007
Number of Hours:    2.00
Brief Description:    Elevator Drilling
Installed the trailing edge wedges and trimmed to fit. Reinstalled and drilled the trailing edges to the elevator skins. Drilled the closeout tabs to the shear clip. Clecoed and final drilled the elevator horns. Started final drilling the skins.