| Date: |
12-7-2018 |
|
| Number of Hours: |
2.25 |
|
| Brief Description: |
Elevator idler arm and control sticks |
|
|
Made the spacer for the elevator idler arm and put the parts together for drilling. Also set up the control sticks for drilling with the control stick bases, although I will check everything again before drilling. Pics: IMG_1863 - IMG_1864.jpg |
||