| Date: |
11-19-2018 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Baggage door final assembly |
|
|
Installed nutplates for the side cover. Also installed the lock on the baggage door and finished riveting the inside panel to the baggage door. Pics: IMG_1838 - IMG_1840.jpg |
||