Date:    11-19-2018
Number of Hours:    2.00
Brief Description:    Baggage door final assembly
Installed nutplates for the side cover. Also installed the lock on the baggage door and finished riveting the inside panel to the baggage door.

Pics: IMG_1838 - IMG_1840.jpg