| Date: |
4-15-2017 |
|
| Number of Hours: |
0.75 |
|
| Brief Description: |
Rear floor pan installation |
|
|
Installed pulled rivets that attach the floor pans to the substructure. I noticed a bit of pillowing of the floor between the ribs but there's nothing I can do about it now, and it's pretty minor. Pic: IMG_0717.jpg |
||