Date:    12-1-2017
Number of Hours:    3.00
Brief Description:    Evaporater mount
More work on the evaporater reinforcement. I am adding a couple of heavy aluminum straps across the back of the evaporater to reinforce it. These will be attached with pulled rivets. I also am adding angles along the existing aluminum angles on the sides to produce a surface parallel to the sides of the evaporater.

Work done on 11/29 and 12/1.

Pics: IMG_0853 - IMG_0855.jpg