| Date: |
12-1-2017 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Evaporater mount |
|
|
More work on the evaporater reinforcement. I am adding a couple of heavy aluminum straps across the back of the evaporater to reinforce it. These will be attached with pulled rivets. I also am adding angles along the existing aluminum angles on the sides to produce a surface parallel to the sides of the evaporater. Work done on 11/29 and 12/1. Pics: IMG_0853 - IMG_0855.jpg |
||