Date:    1-16-2017
Number of Hours:    2.50
Brief Description:    Baggage floor and door reinforcement
More drilling of the baggage floor. Attached and drilled the baggage door seal channels. Separated the baggage floor stiffeners.

Pics: IMG_0682 - IMG_0683.jpg