| Date: |
11-5-2016 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Tailcone attach drilling |
|
|
Constructed the shims for the longerons and drilled the longerons together. Started drilling the skins along the baggage door and skins to bulkheads. IMG_0620.jpg - IMG_0621.jpg |
||