Date:    11-5-2016
Number of Hours:    3.00
Brief Description:    Tailcone attach drilling
Constructed the shims for the longerons and drilled the longerons together. Started drilling the skins along the baggage door and skins to bulkheads.

IMG_0620.jpg - IMG_0621.jpg