| Date: |
8-14-2016 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Step installation |
|
|
Worked on getting the support blocks for the step installed. Used some scrap wood to support the block while it was being drilled. It was a bit of a pain to reach this from the back of the fuselage but that was the best way to get to this using the right angle drill kit. IMG_0581.jpg - IMG_0584.jpg |
||