| Date: |
3-12-2016 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Gear mount |
|
|
Drilled the holes in the side plate for the gear mount bolts, and installed the nutplates for the front brace. Started section 29, measured the mid fuse longerons. IMG_0420.jpg - IMG_0422.jpg |
||