| Date: |
2-3-2016 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Forward cabin floor panels |
|
|
Drilling and surface prep of the front floor panels. I treated these the same as skins that are too large to alodine and I just used the scotchbrite pad on the electric orbital sander to scuff the surface before priming. IMG_0351.jpg - IMG_0352.jpg |
||