| Date: |
1-25-2009 |
|
| Number of Hours: |
1.75 |
|
| Brief Description: |
HS Attach |
|
|
Match-drilled the HS front attach brackets to the deck through the spacers and installed the hardware. Everything looks and measures out extremely square and straight, which gives a good feeling. Pictures: DSC03727 - DSC03729 |
||