| Date: |
6-25-2008 |
|
| Number of Hours: |
1.25 |
|
| Brief Description: |
Aft Deck |
|
|
Match drilled the aft deck into the longerons. Match drilled the attachment bar support angle and the up elevator stop into the aft deck and longerons. Pictures: DSC03653 - DSC03655 |
||