Date:    6-25-2008
Number of Hours:    1.25
Brief Description:    Aft Deck
Match drilled the aft deck into the longerons. Match drilled the attachment bar support angle and the up elevator stop into the aft deck and longerons.

Pictures: DSC03653 - DSC03655