| Date: |
6-20-2008 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
VS spar caps |
|
|
Cut and deburred VS-1014-L and VS-1014-R. Deburred VS-1008. Final drilled VS-1010, VS-1011, VS-1012 to #10 for AN3 (#10) bolts. I found out later in the drawings, 8-2/(3), that they should be final drilled to #12. |
||