| Date: |
10-9-2005 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Gascolator mount |
|
|
Section 11 Installing engine Date 10/9/05 Today I finished the installation of my gascolator mount and the gascolator. The gascolator mount is my design. The material is 6061-t6 aluminum. I produced it on a Bridgeport mill and I have about 8 hrs. total in its production and design. To minimize cracking of the firewall I used proseal as the sealer between the mount and firewall. |
||