| Date: |
4-23-2006 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Air box |
|
|
Date 4-23-06 Sec 12I fabricated the alternate air door on the upper surface of the air box. The only change I made was to fabricate a lever for the door. I assemble the hinge and then the upper and lower air box were riveted together. I chose to glue the seal on the lower air bow rather then pop rivet. I am in process of relocating the fiberglass scoop in the lower cowl for a better alignment to the air box.(image) 100-370,100-371 &100-372 |
||