| Date: |
12-5-2005 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Installing cowl |
|
|
Date 12-05-05 Sec 12today I finished trimming and drilling the hinges for the cowl.next is the oil door and the inside ramps after I rivet the hinges. I will build up the area behine the spinner with foam and glass(images) 100-470 100-471& 100-472 |
||