Date:    12-5-2005
Number of Hours:    8.00
Brief Description:    Installing cowl
Date 12-05-05 Sec 12today I finished trimming and drilling the hinges for the cowl.next is the oil door and the inside ramps after I rivet the hinges. I will build up the area behine the spinner with foam and glass(images) 100-470 100-471& 100-472