| Date: |
6-7-2004 |
|
| Number of Hours: |
20.00 |
|
| Brief Description: |
Roll cage |
|
|
Section 8 Fuselage Date 6/7/2004 I installed the flap motor and produced the flap mechanism per the installation instructions. The throttle quadrants, bell crank, roll cage were installed. (Image) 209,214&215 (Image) 219,218&225 |
||