| Date: |
11-6-2004 |
|
| Number of Hours: |
20.00 |
|
| Brief Description: |
Wiring |
|
|
Section 8 Fuselage Date 11/6/2004 At this point in the construction I decided to install the wiring in the fuselage. I started with the battery location and hold down bracket. I installed the master relay and the starter relay. From there I install all the other electrical components and wire. (Image) 260,261&262 (Image) 264,265&266 (Image) 254,255&258 |
||