| Date: |
10-17-2008 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Assembled Front Spar Assembly |
|
|
Identified parts in the Vertical Stabilizer Assembly. Pressed Flange Bushings into the upper and lower Vertical Stabilizer hinges. Assembled the front spar and transfer drilled all holes to #30. |
||