| Date: |
4-9-2016 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Finish break lines (27-05) |
|
|
This assembly went really well; although I had to enlist the help of my wife (Cyndi) to measure the tube lengths (measure 3 times then measure again just to be sure). The hardest part was getting the clamp installed. Needle nose vice grips were the only thing that I came up with to clamp it together enough to get the nut started, but it's done now. |
||